Outage approval
Evaluate planned outages against the actual recent operating state, with full-AC N-1 / N-2 and Q-limit enforcement — not a stylized study case.

Forge brings the identical core solver to outage approval, next-day studies, what-if scenarios, and reliability evaluations — consuming the canonical .rpf cases Sentinel produces from the real operating state.
Planning teams have always had to settle for stylized cases. The real grid moves faster than the planning case can be refreshed, and the gap between “the model we study against” and “the system we actually operate” only widens with every IBR, every data-center interconnection, every dynamic load.
Forge closes that loop. It runs on the same full-AC Newton-Raphson engine that powers Sentinel, with the same strict Q-limit enforcement, the same intelligent PV-PQ switching, and the same IBR / FACTS / PST awareness. The difference is what you feed it: real operating states from Sentinel, replayable as canonical .rpf files.
Outage approval, next-day reliability studies, what-if asset evaluations — all happening on a high-fidelity model of what your operators saw last shift. Not stylized. Not approximated.
Evaluate planned outages against the actual recent operating state, with full-AC N-1 / N-2 and Q-limit enforcement — not a stylized study case.
Run reliability and transfer-capability studies on tomorrow’s expected topology with the operating state your control room saw last night already loaded.
Test asset additions, retirements, control settings, or IBR build-out against real-system contingency behavior, not against a polished baseline that hides the corner cases.
Greedy reserve dispatch, transfer limits, and corrective N-1 / N-2 inform reliability margin and economic evaluations on the same engine.
There is no “ops model” and “planning model” anymore. There is one grid, one solver, one interchange format — and two teams that finally see the same picture.
Full-AC Newton-Raphson with strict Q-limit enforcement.
Read Sentinel’s real-time output directly. No format conversion.
Provenance, Q-limit results, and PV-PQ switches travel with every case.
On-prem (RHEL certified), air-gapped, or cloud.

If you are evaluating tools for upcoming planning cycles, we will run an outage-approval or what-if scenario on a representative .rpf and walk through the results with your team.
info@raptrixpower.com · Founder direct: matthew.musto@raptrixpower.com · github.com/RaptrixPowerFlow